We track real estate development, including new restaurants and retail... like this place below!

Coming Soon to the North Loop - Barcelona Wine Bar | Read More Here

MIXED-USE BUILDING PROPOSED FOR EAST PHILLIPS SITE

MIXED-USE BUILDING PROPOSED FOR EAST PHILLIPS SITE image

Housing, two daycares and commercial space are planned for a site at the busy intersection of 26th and Bloomington.

Developer Master Properties is planning to demolish an existing two-story building located at 2603 Bloomington Avenue in the East Phillips neighborhood. In its place, a new six-story, mixed-use building with commercial space, residential units and indoor parking would be constructed.

The new building would include 12,000 square feet of ground floor commercial space that would be home to an adult day care, child day care, and two commercial spaces. The upper floors of the building would be home to 79 residential units with several of those units qualifying as affordable housing. 85 parking spaces would be included within the project with 78 being located on one underground level and eight located at the back of the building adjacent to a loading/drop off area.

Units within the building range in size and would include studio, one-bedroom alcove, one-bedroom, two-bedroom, three-bedroom, three-bedroom alcove and four-bedroom layouts.

Amenities within the building would include a large ground floor lobby that would be accessed via Bloomington Avenue S. On the second floor of the building there would be an indoor party room and a large outdoor amenity deck that would include a children’s play area, exercise area, amenity area and green space.

DJR Architecture is responsible for the design of the project which would clad in metal siding, wood look paneling, brick veneer and glass. A living wall system is proposed on the south façade of the building, which faces residential buildings, while a public art feature is planned along the north façade.

Rise Modular would be construct the new building using their unique modular construction method. The method has already been used on one Minneapolis project (MOD42) and is planned to be used on another project in the Glenwood neighborhood. Master Properties has stated that by using the lower cost modular construction method, the developer is able to increase the footprints of two and three-bedroom units.

Plans for 2603 Bloomington Avenue are anticipated to head before the Minneapolis Planning Commission for approval in the fall.

Gallery image 1
Group Created with Sketch.
Gallery image 2
Group Created with Sketch.
Gallery image 3
Group Created with Sketch.
Gallery image 4
Group Created with Sketch.
arrow-right
1/4 2/4 3/4 4/4
arrow-right

Site Team

Developer
Master Properties
Architect
DJR Architecture

More Articles

View all

BARCELONA WINE BAR TO OPEN IN NORTH LOOP

March 17, 2024

There's A New Leader in Twin Cities Real Estate Marketing

Learn More Now

HOTHOUSE OPENS NEWLY EXPANDED DANCE AND FITNESS STUDIO

October 23, 2023

Join Now for TDT Articles

We're tracking the latest in Development News and sending it straight to your inbox.

Which cities would you like to get updates for? *